The National Gallery has owned a 1960s hotel and office block behind the Sainsbury Wing for nearly 30 years, and it finally knows what to do with it. Kengo Kuma’s plans for a new wing on the St Vincent House site, topped by a public roof garden looking out across central London, are out for public consultation until 23 December.
This is the bricks-and-mortar end of Project Domani, the gallery’s £750 million plan to carry its story of Western painting out of the early 20th century and up to the present day. Kuma, the Japanese architect behind V&A Dundee and Tokyo’s National Stadium, is working with BDP and MICA Architects on around 6,000 square metres of galleries and support space, with room for roughly 250 works. For the first time, you’d be able to walk from a 13th-century altarpiece to a painting made this century without leaving the building, which is more than most of us manage on a Sunday.
What’s planned for St Vincent House
St Vincent House sits on St Martin’s Street, the narrow cut-through between Trafalgar Square and Leicester Square that nobody has ever described as a destination. Built for hotel, office and commercial use, it was never meant to hold paintings, and the gallery says it looked hard at adapting it before settling on a purpose-built wing at a broadly similar scale. The main entrance stays at the Sainsbury Wing on Trafalgar Square, with a second public entrance on St Martin’s Street and a new bridge through to the North Galleries.
The street gets the biggest glow-up. The proposals promise new trees, planting and more seating along St Martin’s Street, and a greener, clearer walking route between the two squares. Above it all would sit a landscaped roof garden, open to the public, with views across the West End and a new angle on the gallery itself.
A site with form
Extending the National Gallery has a habit of making headlines. The plot next door produced the most famous insult in British architecture, when Prince Charles called a 1984 design for what became the Sainsbury Wing “a monstrous carbuncle”, and Robert Venturi and Denise Scott Brown’s wing didn’t open until 1991. The gallery bought St Vincent House in the 1990s with exactly this expansion in mind, making it the longest-running plan on Trafalgar Square that doesn’t involve pigeons.
Money looks like less of a hurdle than patience. £375 million is already committed, including £150 million each from Crankstart, the foundation of Sir Michael Moritz and Harriet Heyman, and from the Julia Rausing Trust, two of the largest gifts ever made to a museum or gallery.
When could the new wing open?
Don’t put the roof garden in your diary just yet. This first round of consultation is about principles rather than detail; a second round with developed designs follows in spring 2027, a planning application is intended for summer 2027, and if all goes to plan building starts in 2028 and finishes in 2032. In the meantime the current gallery is still one of the best free museums in London, and our guide to Trafalgar Square covers everything on its doorstep, from the lions to the Lutyens fountains. Carrying on north past the site, our pick of things to do in Leicester Square takes over.
The London x London Take: Fill in the questionnaire now, because this is the stage where the big ideas, roof garden included, can still be pushed around; by spring the conversation moves on to details. Then walk up St Martin’s Street from Trafalgar Square to Orange Street and take a good look at St Vincent House while it’s still standing, since that tired stretch is exactly what the plans most want to change. Our one request for the gallery: keep the roof garden free and open into the evening, because a West End view with no cocktail list attached would be rarer in London than yet another rooftop bar.
Need to know
- What: Public consultation on Project Domani, the National Gallery’s planned new wing by Kengo Kuma, with a public roof garden and a greener St Martin’s Street
- Where: The site is St Vincent House on St Martin’s Street, behind the Sainsbury Wing. The gallery is at Trafalgar Square, London WC2N 5DN
- When: Consultation open until 23 December 2026. Second consultation spring 2027; construction expected to start in 2028 and finish in 2032, subject to planning
- Price: Free to take part, and the National Gallery is free to visit
- How to respond: Questionnaire on the National Gallery’s consultation page, by email to consultation@nationalgallery.org.uk or by phone on 0800 088 4570
- Nearest station: Charing Cross or Leicester Square





